Unit C9B Admiralty Park, Station Road, Holton Heath, Poole
Industrial
The development comprises 14 new industrial units of steel portal frame construction with silver composite mini-rib panels to front elevations under steel profile sheet roofs with contrasting “anthracite” coloured gutters and trims. Access is via a sectional loading door and personnel door to the front elevation of each unit.
Features
- Three phase electricity
- Gas supply
- Separate WC
- Sectional loading doors
- Concrete floor
- Allocated car parking
Location
Admiralty Park comprises the former Royal Naval Cordite Factory (RNCF) set within a mature parkland setting extending to around 42 acres. The site itself is accessible from Station Road off the A351 Sandford Road. Poole Town Centre is conveniently within approximately a 15-minute drive via the A351, the A35 and then the A350. Wareham is situated approximately 3 miles to the Southwest.
Holton Heath Station is located within 50M of the southern boundary of the site providing rail links to Weymouth and London Waterloo.
Admiralty Park itself is within walking distance of pine forests, heathland and grassland, some of which are designated as SSSI’s and Conservation Areas.
Rating
The Valuation Office Agency states that the property has a rateable value of £7,300. The Rates Payable will be determined by the Uniform Business Rate Multiplier which is set by the Government annually.
Rates payable may also be subject to transitional or small business rates relief and interested parties are therefore encouraged to contact the Local Rating Authority directly.
Terms
The units are available on new Full Repairing & Insuring Leases for a term to be agreed incorporating 3 yearly upwards only rent reviews.
Energy
Legal Costs
The ingoing tenant to be responsible for the landlords reasonable legal costs incurred in the preparation of a new Lease.
Strictly subject to contract. All measurements are approximate.
These particulars are believed to be correct, but their accuracy is not guaranteed and they do not constitute an offer or contract.
At no time has a structural survey been undertaken and services have not been tested. Interested parties should satisfy themselves as necessary as to the structural integrity of the premises and condition / working order of services, plant or equipment.